This soil stabilization technology offers enormous benefits in sectors such as sulphide soil management and road and rail construction projects. Stabilizing the soil in place eliminates the need to dig up and transport away valuable clay, which both reduces costs and saves natural resources.
"After a careful process of scanning the alternatives on the market, there was finally only Norditek left, which can now solve this with a soil stabilization that provides both the right properties on the soil and can maintain a sufficiently high production capacity without the plant becoming a big monster," says Andreas Pettersson, Norditek.
The mobile recycling plant gives PreZero a unique position in the market to handle masses that previously could not be reused. With a maximum capacity of 200 tons per hour, the plant is now a unique facility with high production capacity and flexibility.
As the recycling plant is mobile, PreZero can now offer on-site stabilization and reduce transport with negative environmental impact. As it will also be possible to use residual products such as burnt lime or ash in the stabilization process itself, it means that you now get a higher resource efficiency on other materials as well.
The mobile recycling plant for soil stabilization will be commissioned in early 2025.
Norditek works to make recycling easier and more efficient. From excavated material to production waste, construction waste and biofuels, it develops and offers flexible and efficient recycling facilities. Through innovation and systems thinking, it helps customers to maximize recycling rates, all the way from material samples to full-scale production, always with the goal of creating a more resource-efficient and circular future.
For further information, please contact
Andreas Pettersson
Sales, Mälardalen and Norrland
andreas.pettersson@norditek.se
073-413 98 20